Yuwono, Bambang Endro and Devi, Anisyah Kumala (2015) Pengembangan Model Produktivitas Kegiatan Bongkar Muat Peti Emas(Studi Kasus Pelabuhan Peti Emas Balik Papan). Jurnal Sipil, 15 (1). pp. 1-16. ISSN 1411-9064

[img]
Preview
Text
1. Jurnal Anisyah (1-16) OK.pdf

Download (613kB) | Preview
Item Type: Article
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil Engineering and Planning > Department of Civil Engineering
Depositing User: FTSP UNIVERSITAS TRISAKTI
Date Deposited: 27 Jul 2017 07:46
Last Modified: 27 Jul 2017 07:46
URI: http://libprint.trisakti.ac.id/id/eprint/69

Actions (login required)

View Item View Item