Faktor Tenaga Kerja Dalam Keterlambatan Waktu Pelaksanaan Proyek Konstruksi

Rintawati, Dewi and Corina, Corina (2012) Faktor Tenaga Kerja Dalam Keterlambatan Waktu Pelaksanaan Proyek Konstruksi. Jurnal Sipil, 12 (2). pp. 116-130. ISSN 1411-9064

[thumbnail of DEWI RINTAWATI.pdf]
Preview
Text
DEWI RINTAWATI.pdf

Download (4MB) | Preview
Item Type: Article
Uncontrolled Keywords: Labor, Delay, Communication, Labor Welfare
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil Engineering and Planning > Undergraduate Program in Civil Engineering
Depositing User: FTSP UNIVERSITAS TRISAKTI
Date Deposited: 24 Aug 2017 05:54
Last Modified: 24 Aug 2017 05:54
URI: http://libprint.trisakti.ac.id/id/eprint/201

Actions (login required)

View Item View Item
View My Stats