Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: D | H | I | K | P | S | T | Y
Number of items: 12.

D

Damayanti, Julia and Maulani, Mustamina and Sumartinah, Endang (2018) MATEMATIKA: Kalkulus Fungsi Dua Variabel atau Lebih. Penerbit Universitas Trisakti, Jl. Kyai Tapa No. 1 Grogol Jakarta 1140. ISBN 978-602-0750-00-2

H

Hidayat, DPA and Yudistira, Yudi (2018) MODELLING OF DOMESTIC WATER DEMAND USING SPATIAL DATA POPULATION FOR CISADANE UPSTREAM WATERSHED. INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD), 1 (1). pp. 16-22. ISSN 2621-4146

I

Irlan, Ade Oktavianti (2018) SISTEM ISOLASI SEISMIK STRUKTUR GEDUNG RUMAH SAKIT PRATAMA ENREKANG SULAWESI SELATAN. INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD), 1 (1). pp. 1-5. ISSN 2621-4146

K

Kawanda, Aksan (2018) RECENT ADVANCES OF CAST-IN-SITU PILE INTEGRITY TEST IN INDONESIA. INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD), 1 (1). pp. 23-27. ISSN 2621-4146

Kawanda, Aksan and Wijaya, Amelia (2018) ANALISA PENURUNAN RAFT-PILED FOUNDATIONAREA BOGIE WAREHOUSE PROYEK JAKARTA LRT SECTION DEPOT. INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD), 1 (2). pp. 76-81. ISSN 2621-4146

P

Pontan, Darmawan and Surjokusumo, S. and Johan, Johny and Ahmar, Ansari Saleh (2018) Effect of The Building Maintenance and Resource Management Through User Satisfaction of Maintenance. International Journal of Engineering & Technology, 7 (2). pp. 462-465.

Putri, Christy Anandha (2018) PENGARUH MATERIAL BUTIR HALUS TERHADAP TINGKAT KEPADATAN CAMPURAN MATERIAL RESIDUAL (The Effects of Fine Grained to a Density of a Residual Material Mixtures). Jurnal Infrastruktur Universitas Pancasila, 4 (2). pp. 113-117. ISSN 2476-9339

S

Susanto, Daniel Arie and Sekarsari, Jane (2018) Analis faktor yang berpengaruh pada biaya pelaksanaan perkuatan baja pada dinding furnance industri kaca. Seminar Nasional Pakar (1). pp. 21-26. ISSN 2615-3343

T

Triarman, Christopher and Sekarsari, Jane (2018) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN WAKTU PADA PEKERJAAN STRUKTUR ATAS PROYEK KONSTRUKSI. Jurnal Penelitian dan Karya Ilmiah Lembaga Penelitian Universitas Trisakti, 3 (2). pp. 1-9. ISSN 0853-7720

Y

Yuwono, Bambang Endro (2018) Penilaian Risiko Pelaksanaan Proyek Light Rail Transit (LRT) Jabodetabek. In: UNSPECIFIED.

Yuwono, Bambang Endro and Raflis, and Rayshanda, Ripsky (2018) MANFAAT PENGGUNAAN BUILDING INFORMATION MODELLING (BIM) PADA PROYEK KONSTRUKSI SEBAGAI MEDIA KOMUNIKASI STAKEHOLDERS. INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD), 1 (2). pp. 62-66. ISSN 2621-4146

Yuwono, Bambang Endro and Yai, Dwi Emi Lisa and Waryanto, Achmad (2018) KOMPATIBILITAS DISAIN : PENENTU KINERJA WAKTU PELAKSANAAN BANGUNAN GEDUNG. INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD), 1 (1). pp. 28-35. ISSN 2621-4146

This list was generated on Thu Apr 25 19:18:56 2019 WIB.